Client AVG Country Brazil Mineral Type Iron Ore Timeframe 2003 Services Provided
![]() |
Project Highlights
Smart EngineeringThe project is a two-stage spiral plant for beneficiation of fine iron ore -1.0mm to 0.075mm at a feed rate of 205 t/h. The scope required Mineral Technologies to conduct onsite testwork and to evaluate the capability of spirals for the beneficiation of fine iron ore. On acceptance of the testwork results Mineral Technologies was selected as the preferred supplier of separation equipment and an EPCM contract. The final contract scope of supply included:
Successful commissioning of a two-stage spiral circuit totalling 96 twin start spiral separators was completed in September 2004 with both concentrate grade and production capacity achieved. |
Local Place Holder
Local Place holderAVG - 1.2MTPA Fine Iron Ore Beneficiation Plant - EPC or EPCM Project

Mineral Processing Solutions
Technology
- Gravity Separation, Distributors & Launders
- Electrostatic Separation
- Centrifugal Jig
- Magnetic Separation
- Ultra Fine Grinding Mill
- Shaking Tables
Services
- Mineral characterisation & separation testwork
- Bench & pilot scale testing
- Density fractionation by heavy liquid separation & pycnometry
- Metallurgical data evaluation & production of bulk mineral concentrates
- Process flowsheet design
- Process plant engineering
- Equipment commissioning & training
- Process improvement & optimisation
- Equipment servicing & spares